waferimage

Industry Standard Pricing Structure: MPW and Full-Mask (NTO)

Industry Standard Pricing Structure: MPW and Full-Mask (NTO)

This document outlines the factual cost calculation logic used by semiconductor foundries for MPW and Full-Mask projects.


1. MPW (Multi-Project Wafer) Pricing Logic

MPW pricing is determined by the number of allocated “Seats” and the number of extra wafers purchased to increase die count.

[Formula]

MPW Cost = (Seat Price × Seat Count) + (Wafer Unit Price × Extra Wafer Qty)

  • Seat Allocation (Reticle Allocation):
    • Foundries define a fixed grid (e.g., 5mm × 5mm) as One Seat.
    • The billing benchmark is the Die Size (including the Seal Ring).
    • If the die size exceeds the grid limit by any margin (e.g., 5.01mm), Two Seats are charged.
    • Scribe Lane: Spacing between different customers’ dies is managed by the foundry and is not included in the customer’s die size calculation for billing.
  • Deliverables (Sample Quantity):
    • Standard Output: The base Seat Price includes a Fixed Gross Quantity of dies (typically 30–50 ea).
    • Condition: Deliverables are Untested Gross Dies.
  • Extra Quantity:
    • If more samples are required, the customer must purchase extra wafers at the time of booking.
    • The customer pays the Wafer Unit Price per additional wafer to receive the extra volume of their specific dies.

2. Full-Mask (NTO) Pricing Logic

Full-Mask pricing is the sum of the Mask NRE and the production cost of the initial wafers, proportional to the number of process layers.

[Formula]

Total NTO Cost = Mask NRE + (Wafer Unit Price × Wafer Qty)

  • Mask NRE (Non-Recurring Engineering):
    • The total cost is the sum of the prices for each individual mask layer.
    • Mask NRE = Σ (Mask Cost per Layer)
    • Individual mask costs vary depending on the lithography tool required (e.g., ArF Immersion, ArF, KrF, or I-line).
  • Wafer Unit Price:
    • The price per wafer is determined by the total number of mask layers in the process.
    • Wafer Unit Price ≈ (Total Mask Layers) × (Cost per Layer Step)
  • Initial Lot:
    • NTO contracts typically include an initial lot (e.g., 12 or 25 wafers) as the minimum starting volume.

Summary Table

FeatureMPW (Multi-Project Wafer)Full-Mask (NTO)
Primary Cost FactorSeat Count (Grid Allocation)Layer Count (Masks & Steps)
Size BenchmarkDie Size (including Seal Ring)Full Mask Set (Fixed)
Output TypeGross Dies (Untested)Full Wafers
Extra VolumeExtra Wafer PurchaseAdditional Wafer Qty